Project Description

Connaught has provided the opportunity for Grassroots to be involved in all aspects of their overall renovation Master Plan.

In 2011, Grassroots installed a 1200 head Toro Osmac irrigation system. The system used HDPE throughout, and a combination of trenching and vibratory plow to limit disturbance and rehab.

In 2013 Grassroots was again contracted, this time to build a new green and bunker complex on #10. This project included site grading, installation of drainage and approved greens mix, topsoiling and sodding of the green & bunker surrounds, and modifying the existing irrigation to suit the needs of the new complex.