Project Description

Constructed as part of an overall flood protection program by the City of Medicine Hat, the Harlow Flood Berm was the first phase to be completed in summer 2015.

Grassroots was contracted to perform the seeding and hydroseeding on both faces, install C350 ECB on the “wet side” of the berm with top and bottom key trenches, and Flexterra FGM as ECB alternative on the “dry side” of the berm.