In 2010 Grassroots was contracted to do the riparian & wetland plantings in 6 storm ponds constructed to handle the storm water resulting from the construction of the NW leg of Stoney Trail in Calgary. As well as the plantings, Grassroots was also contracted to hydroseed all the head slopes and other select locations for [...]
Southlands 6B
PTKWeb2020-02-03T09:31:45-07:002015 saw Grassroots construct the flagship community park for the City of Medicine Hat Land & Properties Division. This park saw the construction of a toboggan hill, limestone waterfall and creek feeding into a pond that services the irrigation system with both potable and raw water capabilities. On top of all that, Grassroots installed a [...]

Ranchlands Future School Site
PTKWeb2017-01-31T15:20:45-07:00A turnkey project for The City of Medicine Hat Parks Department, Grassroots worked hard to transform this 14 acre site into a lush landscape with a wildflower dry pond for the local community. Grassroots own forces and subcontractors completed the site grading, topsoil placement & amendment, installation of a 32 zone HDPE Rainbird irrigation system, [...]
Harlow Flood Berm
PTKWeb2017-01-31T15:21:06-07:00Constructed as part of an overall flood protection program by the City of Medicine Hat, the Harlow Flood Berm was the first phase to be completed in summer 2015. Grassroots was contracted to perform the seeding and hydroseeding on both faces, install C350 ECB on the “wet side” of the berm with top and bottom [...]
Brooks Quad
PTKWeb2017-01-31T15:21:22-07:00Grassroots completed this 4 diamond project in 2013 for the City of Brooks. Highlights of the project included full site grading, topsoil placement, 32 zone Hunter Decoder irrigation installation (HDPE mainline, PVC laterals, VFD Booster Pump), shale supply & placement, sod (Big Roll) and hydroseeding as well as tree planting.