![Southlands 6: Creek Development](https://justaddwater.ca/wp-content/uploads/2016/04/20150812_121136.jpg)
Southlands 6B – City of Medicine Hat Land & Properties Division
June 14, 2022![](https://justaddwater.ca/wp-content/uploads/2022/08/IMG_0106-scaled.jpg)
We have done a few flood berms for the City of Medicine Hat in the past few years, these include:
– Harlow Berm
– Industrial Ave #1 Berm
– Industrial Ave #2 Berm
All three berms saw the installation of Turf Reinforcement Matting on the wet side of the berm, and Flexterra FGM was applied to the dry side for erosion protection.