In 2010 Grassroots was contracted to do the riparian & wetland plantings in 6 storm ponds constructed to handle the stormwater resulting from the construction of the NW leg of Stoney Trail in Calgary. As well as the plantings, Grassroots was also contracted to hydroseed all the head slopes and other select locations for each overpass on that section of the ring road.